IMPROVEMENT OF DRILLING AND COMPLETION MATERIAL WITHDRAWAL SYSTEM AT PT. CHEPACINDO THROUGH JUST IN TIME APPROVAL PROCESS
Rig operation is critical activity in upstream oil production which manage by Drilling and Completion (D&C) department in PT. CHEPACINDO. D&C department manage multiple rig operation that operates 24 hours a day, 7 days a week (24-7) and covered all area of its operation in Riau province....
Saved in:
Main Author: | Irwan |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/55020 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF COST BOOK & DIGITAL DASHBOARD TO IMPROVE COST MONITORING IN DRILLING & COMPLETIONS
by: Wijaya, Candy -
IMPROVING DECISION MAKING PROCESS FOR DRILLING IN SOME SUBSIDIARY COMPANY IN PT PERTAMINA
by: Hendrian, Dicki -
OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
by: Ryan Aditya Surya Wijaya, Raden -
IMPROVEMENT OF QUALITY AND COMPLETION TIME FOR REQUEST FOR PAYMENT AND DOCUMENTATION CHECKING PROCESS BY UTILIZING SIX SIGMA DMAIC METHODOLOGY
by: Faisal Al Rasjid, Muhammad -
DECISION MAKING PROCESS TO SELECT FIT FOR PURPOSE MODEL OF WELL ASSURANCE PROGRAM IMPLEMENTATION IN FACTORY MODE OF DRILLING AND COMPLETION OPERATION IN ROCK ONE BLOCK
by: Lutfi Hamdani, Nanang