IMPROVEMENT OF DRILLING AND COMPLETION MATERIAL WITHDRAWAL SYSTEM AT PT. CHEPACINDO THROUGH JUST IN TIME APPROVAL PROCESS

Rig operation is critical activity in upstream oil production which manage by Drilling and Completion (D&C) department in PT. CHEPACINDO. D&C department manage multiple rig operation that operates 24 hours a day, 7 days a week (24-7) and covered all area of its operation in Riau province....

Full description

Saved in:
Bibliographic Details
Main Author: Irwan
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/55020
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first