PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT

Construction is an activity to build facilities and infrastructure. In an architectural or civil engineering field, a construction is also known as a building or infrastructure unit in an area or several areas. PT. TeamworX Indonesia (TeamworX) is a Construction Consultant and they have assisted...

Full description

Saved in:
Bibliographic Details
Main Author: Pranata Surbakti, Erwin
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/55656
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:55656
spelling id-itb.:556562021-06-18T13:10:43ZPROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT Pranata Surbakti, Erwin Manajemen umum Indonesia Theses Construction, Construction Management, Contractor, Project, Estimation, Schedule, Worker’s productivity INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/55656 Construction is an activity to build facilities and infrastructure. In an architectural or civil engineering field, a construction is also known as a building or infrastructure unit in an area or several areas. PT. TeamworX Indonesia (TeamworX) is a Construction Consultant and they have assisted a wide range of clients across Indonesia since 2003. TeamworX believes in ‘turning your plan into reality’ by providing one stop service solutions from concept up to completion. While TeamworX has been working in the construction world since 2003, several issues or problems that occurred in a construction project were found, including the contractor is not performing well, low discipline of contractors, error estimation during tender, etc. One of the departments at PT. TeamworX Indonesia which managed the project construction is Construction Management (CM). This department in general is manage the project from administration, project excecution, and project completion. One of the important elements in building a construction is the availability and productivity of labor. In this study, problems or issues related to the availability and productivity of labor will be an item of analysis of problems that occur in the PT. ABCD. The 5 why analysis method was carried out to find the root of the problems that occurred in the PT. ABCD resulting in delays in project completion. The results of the 5 why analysis, author will calculate the needs and productivity of labor. The results of this calculation will be compared with the actual so that it can be seen that the workforce provided by the Contractor is insufficient to meet the volume requirements of the work. From the results of the analysis of job duration, labor requirements and labor productivity, two alternative solutions or scenarios can be obtained that can achieve the work completion target. (1) By adding workers, (2) Increase workers productivity. The solution made by authors namely develop project management planning is a solution to easy to be adapted by Contractor or another Construction Management teams for executing that proposed solution, some resources are needed, such as the person who is in-charge to make manpower calculation and asses some activities in implementation plan. Results of the calculations can be implemented on an ongoing project or for an upcoming project, in this case the calculation of labor needs to be discussed in advance with the contractor at the beginning of the project and the total labor force needs to be approved together. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Pranata Surbakti, Erwin
PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT
description Construction is an activity to build facilities and infrastructure. In an architectural or civil engineering field, a construction is also known as a building or infrastructure unit in an area or several areas. PT. TeamworX Indonesia (TeamworX) is a Construction Consultant and they have assisted a wide range of clients across Indonesia since 2003. TeamworX believes in ‘turning your plan into reality’ by providing one stop service solutions from concept up to completion. While TeamworX has been working in the construction world since 2003, several issues or problems that occurred in a construction project were found, including the contractor is not performing well, low discipline of contractors, error estimation during tender, etc. One of the departments at PT. TeamworX Indonesia which managed the project construction is Construction Management (CM). This department in general is manage the project from administration, project excecution, and project completion. One of the important elements in building a construction is the availability and productivity of labor. In this study, problems or issues related to the availability and productivity of labor will be an item of analysis of problems that occur in the PT. ABCD. The 5 why analysis method was carried out to find the root of the problems that occurred in the PT. ABCD resulting in delays in project completion. The results of the 5 why analysis, author will calculate the needs and productivity of labor. The results of this calculation will be compared with the actual so that it can be seen that the workforce provided by the Contractor is insufficient to meet the volume requirements of the work. From the results of the analysis of job duration, labor requirements and labor productivity, two alternative solutions or scenarios can be obtained that can achieve the work completion target. (1) By adding workers, (2) Increase workers productivity. The solution made by authors namely develop project management planning is a solution to easy to be adapted by Contractor or another Construction Management teams for executing that proposed solution, some resources are needed, such as the person who is in-charge to make manpower calculation and asses some activities in implementation plan. Results of the calculations can be implemented on an ongoing project or for an upcoming project, in this case the calculation of labor needs to be discussed in advance with the contractor at the beginning of the project and the total labor force needs to be approved together.
format Theses
author Pranata Surbakti, Erwin
author_facet Pranata Surbakti, Erwin
author_sort Pranata Surbakti, Erwin
title PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT
title_short PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT
title_full PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT
title_fullStr PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT
title_full_unstemmed PROPOSED MANPOWER ANALYSIS OF CONCRETE WORKS IN CONSTRUCTION: A CASE STUDY AT ONE OF PT. TEAMWORX INDONESIA’S PROJECT
title_sort proposed manpower analysis of concrete works in construction: a case study at one of pt. teamworx indonesia’s project
url https://digilib.itb.ac.id/gdl/view/55656
_version_ 1822002134585966592