ANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK

Louvin Student Apartment Project is a building construction project owned by PT PP Properti Tbk, with PT PP (Persero) Tbk as the contractor. As a project that is prone to work accidents, it is important for project team to manage OHS (Occupational Health and Safety) risks. OHS risks not only impa...

Full description

Saved in:
Bibliographic Details
Main Author: Angelina Lauwdy, Catherine
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/55687
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:55687
spelling id-itb.:556872021-06-18T14:01:56ZANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK Angelina Lauwdy, Catherine Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project HSE risk analysis, work accident costs, building construction projects. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/55687 Louvin Student Apartment Project is a building construction project owned by PT PP Properti Tbk, with PT PP (Persero) Tbk as the contractor. As a project that is prone to work accidents, it is important for project team to manage OHS (Occupational Health and Safety) risks. OHS risks not only impact to worker’ safety, but also project costs. Therefore, this study aims to analyze OHS risks by considering the cost of risk so that the project team know how much loss is incurred if workers are not safe. This study uses three-point estimation as the research method because this method can calculate the risk score in costs. There were 124 risks analyzed obtained by the 80/20 pareto analysis of 173 risks. The results of the analysis showed the variation in the risk score from Rp1.544.165.110,83 to Rp2.129.900.851,60. Overall, the total risk score was Rp207.321.143.175,70. To minimize the risk score, mitigation was planned using PPE (Personal Protective Equipment), collective protection equipment, and training. The total cost of mitigation was Rp603.251.200,00, with PPE costs was Rp396.993.200,00, collective protection equipment was Rp183.058.000,00, and training was Rp23.200.000,00. Because mitigation cost was smaller than the risk score, so mitigation was feasible. This study shows that the three-point estimation provides more accurate risk score than the probability-impact matrix. Although three-point estimation is more difficult and the accuracy of the results depends on the data used, it can be overcome by starting to collect related data and conduct research/investigation of work accidents in more detail. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Angelina Lauwdy, Catherine
ANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK
description Louvin Student Apartment Project is a building construction project owned by PT PP Properti Tbk, with PT PP (Persero) Tbk as the contractor. As a project that is prone to work accidents, it is important for project team to manage OHS (Occupational Health and Safety) risks. OHS risks not only impact to worker’ safety, but also project costs. Therefore, this study aims to analyze OHS risks by considering the cost of risk so that the project team know how much loss is incurred if workers are not safe. This study uses three-point estimation as the research method because this method can calculate the risk score in costs. There were 124 risks analyzed obtained by the 80/20 pareto analysis of 173 risks. The results of the analysis showed the variation in the risk score from Rp1.544.165.110,83 to Rp2.129.900.851,60. Overall, the total risk score was Rp207.321.143.175,70. To minimize the risk score, mitigation was planned using PPE (Personal Protective Equipment), collective protection equipment, and training. The total cost of mitigation was Rp603.251.200,00, with PPE costs was Rp396.993.200,00, collective protection equipment was Rp183.058.000,00, and training was Rp23.200.000,00. Because mitigation cost was smaller than the risk score, so mitigation was feasible. This study shows that the three-point estimation provides more accurate risk score than the probability-impact matrix. Although three-point estimation is more difficult and the accuracy of the results depends on the data used, it can be overcome by starting to collect related data and conduct research/investigation of work accidents in more detail.
format Final Project
author Angelina Lauwdy, Catherine
author_facet Angelina Lauwdy, Catherine
author_sort Angelina Lauwdy, Catherine
title ANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK
title_short ANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK
title_full ANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK
title_fullStr ANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK
title_full_unstemmed ANALISIS RISIKO K3 (KESELAMATAN DAN KESEHATAN KERJA) DENGAN MEMPERTIMBANGKAN BIAYA RISIKO PADA PROYEK LOUVIN STUDENT APARTMENT OLEH PT PP PROPERTI TBK
title_sort analisis risiko k3 (keselamatan dan kesehatan kerja) dengan mempertimbangkan biaya risiko pada proyek louvin student apartment oleh pt pp properti tbk
url https://digilib.itb.ac.id/gdl/view/55687
_version_ 1822002142509006848