FISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR

The need ofelectrical energy is growing all the time. Technology in the world of energy conversion still continues to evolve. Researchers continue to develop energy conversion technologies to obtain high efficiency and to overcome various limitations that exist. Geothermal energy is one of s...

Full description

Saved in:
Bibliographic Details
Main Author: Erland Yeshua Riwu Kaho, Talo
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/55837
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:55837
spelling id-itb.:558372021-06-19T17:32:27ZFISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR Erland Yeshua Riwu Kaho, Talo Indonesia Final Project ORC, efficiency, working fluid, geothermal fluid. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/55837 The need ofelectrical energy is growing all the time. Technology in the world of energy conversion still continues to evolve. Researchers continue to develop energy conversion technologies to obtain high efficiency and to overcome various limitations that exist. Geothermal energy is one of several solutionas a new and renewable clean energy. Development and utilizationof geothermal energy is still small, especially in Indonesia as one of the countries with the largest geothermal potential in the world. Atadei itself is one of the areas in NTT that has the potential for geothermal energy but has not yet felt electricity. Currently, technology in the conversion of geothermal energy also varies widely. organic rankine cycle is a technology that can overcome the problem of low temperature geothermal fluids. In this study, various designs of power plants with organic rankine cycle technology were modeled with r245fa as working fluid using EBSILON Professional software, namely the basic ORC design and with addition of combination of preheater, superheater, and recuperator. The system model will be compared in technical and economic aspects. The results show that the utilization of the superheater, the preheater isthe most optimumsystemwith a maximum output power of 2421,683 kW and an efficiency of 13,638% and is able to power all household loads in Atadei sub-district. Economically, this system also has an attractive IRR and payback period, and the highest NPV. The cost of generating electricity in WKP Atadei, NTT is determined by the LCOE method which results in an electricity cost of IDR 821.27 / kWh. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The need ofelectrical energy is growing all the time. Technology in the world of energy conversion still continues to evolve. Researchers continue to develop energy conversion technologies to obtain high efficiency and to overcome various limitations that exist. Geothermal energy is one of several solutionas a new and renewable clean energy. Development and utilizationof geothermal energy is still small, especially in Indonesia as one of the countries with the largest geothermal potential in the world. Atadei itself is one of the areas in NTT that has the potential for geothermal energy but has not yet felt electricity. Currently, technology in the conversion of geothermal energy also varies widely. organic rankine cycle is a technology that can overcome the problem of low temperature geothermal fluids. In this study, various designs of power plants with organic rankine cycle technology were modeled with r245fa as working fluid using EBSILON Professional software, namely the basic ORC design and with addition of combination of preheater, superheater, and recuperator. The system model will be compared in technical and economic aspects. The results show that the utilization of the superheater, the preheater isthe most optimumsystemwith a maximum output power of 2421,683 kW and an efficiency of 13,638% and is able to power all household loads in Atadei sub-district. Economically, this system also has an attractive IRR and payback period, and the highest NPV. The cost of generating electricity in WKP Atadei, NTT is determined by the LCOE method which results in an electricity cost of IDR 821.27 / kWh.
format Final Project
author Erland Yeshua Riwu Kaho, Talo
spellingShingle Erland Yeshua Riwu Kaho, Talo
FISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR
author_facet Erland Yeshua Riwu Kaho, Talo
author_sort Erland Yeshua Riwu Kaho, Talo
title FISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR
title_short FISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR
title_full FISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR
title_fullStr FISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR
title_full_unstemmed FISIBILITY AND ECONOMIC ANALYSIS OF GEOTHERMAL POWER PLANT BASED ON ORGANIC RANKINE CYCLE IN ATADEI, NUSA TENGGARA TIMUR
title_sort fisibility and economic analysis of geothermal power plant based on organic rankine cycle in atadei, nusa tenggara timur
url https://digilib.itb.ac.id/gdl/view/55837
_version_ 1822274393296863232