IMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS

One of the criteria for Construction project success is the completion of projects on time. Several Construction projects in Indonesia have experienced delays and disruptions, which have a significant impact on project financing, and may even affect project sustainability. SCL: Delay and Disrupti...

Full description

Saved in:
Bibliographic Details
Main Author: Fitrah, Allan
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/55900
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:55900
spelling id-itb.:559002021-06-19T21:45:20ZIMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS Fitrah, Allan Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Theses delay, disruption, SCL Protocol, delay analysis, Construction INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/55900 One of the criteria for Construction project success is the completion of projects on time. Several Construction projects in Indonesia have experienced delays and disruptions, which have a significant impact on project financing, and may even affect project sustainability. SCL: Delay and Disruption Protocol is a scheme for dealing with delays and disruptions and is prepared to provide guidance on matters to be addressed while contracts are being drafted and negotiated, as well as for the management of claims for delays and disruptions that arise during the project. This study uses an approach and deepening the related literature to investigate the extent to which each party is responsible for project delays and whether this Protocol can be considered for application in the analysis of delays and disruptions in Construction projects in Indonesia. This research examines the contents, stages and functions of the SCL Protocol then creates a framework that shows the overall delay and disruption Protocols. Then review the application of the SCL in one case and then apply it to the other. The application of the SCL: Delay and Disruption Protocol has the potential to be applied because basically the Oil and Gas infrastructure X project, Contractor which is one of the case studies has applied the SCL Protocol in project recording, submitting sub-network / delay Fragnet (Employer Risk Event) as soon as possible when / After the delay event occurs, describes the actual delay and projects the delay impact then the Contractor performs an analysis to determine the longest critical path. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Fitrah, Allan
IMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS
description One of the criteria for Construction project success is the completion of projects on time. Several Construction projects in Indonesia have experienced delays and disruptions, which have a significant impact on project financing, and may even affect project sustainability. SCL: Delay and Disruption Protocol is a scheme for dealing with delays and disruptions and is prepared to provide guidance on matters to be addressed while contracts are being drafted and negotiated, as well as for the management of claims for delays and disruptions that arise during the project. This study uses an approach and deepening the related literature to investigate the extent to which each party is responsible for project delays and whether this Protocol can be considered for application in the analysis of delays and disruptions in Construction projects in Indonesia. This research examines the contents, stages and functions of the SCL Protocol then creates a framework that shows the overall delay and disruption Protocols. Then review the application of the SCL in one case and then apply it to the other. The application of the SCL: Delay and Disruption Protocol has the potential to be applied because basically the Oil and Gas infrastructure X project, Contractor which is one of the case studies has applied the SCL Protocol in project recording, submitting sub-network / delay Fragnet (Employer Risk Event) as soon as possible when / After the delay event occurs, describes the actual delay and projects the delay impact then the Contractor performs an analysis to determine the longest critical path.
format Theses
author Fitrah, Allan
author_facet Fitrah, Allan
author_sort Fitrah, Allan
title IMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS
title_short IMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS
title_full IMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS
title_fullStr IMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS
title_full_unstemmed IMPLEMENTATION STUDY OF SOCIETY OF CONSTRUCTION LAW (SCL): DELAY AND DISRUPTION PROTOCOL FOR DEALING WITH CONCURRENT DELAYS ON INDONESIAN PROJECTS
title_sort implementation study of society of construction law (scl): delay and disruption protocol for dealing with concurrent delays on indonesian projects
url https://digilib.itb.ac.id/gdl/view/55900
_version_ 1822930036061110272