MAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT

Based on the hierarchy of waste management, currently it is carried out by maximizing the reduction of waste sent to the TPA and optimizing the 3R (reduce, reuse recycle) waste processing in waste processing sites (TPS). Based on the existing conditions, the management at Harapan Island TPS has carr...

Full description

Saved in:
Bibliographic Details
Main Author: Irene, Sally
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/56358
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:56358
spelling id-itb.:563582021-06-22T08:20:39ZMAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT Irene, Sally Indonesia Final Project 3R (reduce, reuse, recycle); Pulau Harapan dan Pulau Panggang; redesign; Skenario Optimis; Tempat Pengolahan Sampah (TPS). INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/56358 Based on the hierarchy of waste management, currently it is carried out by maximizing the reduction of waste sent to the TPA and optimizing the 3R (reduce, reuse recycle) waste processing in waste processing sites (TPS). Based on the existing conditions, the management at Harapan Island TPS has carried out sorting from sources and made several recycled products either by biological, physical, or thermal processing, but there are still deficiencies. At Panggang Island TPS, the processing carried out is still very minimal, this has resulted in the TPS area being unorganized and disturbing the aesthetics. Thus, it is necessary to redesign the waste management from TPS to TPS 3R on Harapan Island and Panggang Island. By paying attention to technical, economic, social, institutional, and environmental factors, the management of TPS 3R is planned using optimistic scenario management from 3 scenario choices, namely pessimistic, moderate and optimistic. In this scenario, the waste collected from the source experiences a waste reduction of 10% with an increase of 2% each year and is separated into organic and inorganic waste. At TPS 3R, biological processing will be carried out with a handling rate of 80% and a rate of 2% annually to 100%, physical with a handling rate of 85% and a rate of 1.5% annually to 100%, and thermal 90%. Using this scenario the reduction rate achieved was 86% for TPS 3R Pulau Harapan and Pulau Panggang at the end of the planning period. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Based on the hierarchy of waste management, currently it is carried out by maximizing the reduction of waste sent to the TPA and optimizing the 3R (reduce, reuse recycle) waste processing in waste processing sites (TPS). Based on the existing conditions, the management at Harapan Island TPS has carried out sorting from sources and made several recycled products either by biological, physical, or thermal processing, but there are still deficiencies. At Panggang Island TPS, the processing carried out is still very minimal, this has resulted in the TPS area being unorganized and disturbing the aesthetics. Thus, it is necessary to redesign the waste management from TPS to TPS 3R on Harapan Island and Panggang Island. By paying attention to technical, economic, social, institutional, and environmental factors, the management of TPS 3R is planned using optimistic scenario management from 3 scenario choices, namely pessimistic, moderate and optimistic. In this scenario, the waste collected from the source experiences a waste reduction of 10% with an increase of 2% each year and is separated into organic and inorganic waste. At TPS 3R, biological processing will be carried out with a handling rate of 80% and a rate of 2% annually to 100%, physical with a handling rate of 85% and a rate of 1.5% annually to 100%, and thermal 90%. Using this scenario the reduction rate achieved was 86% for TPS 3R Pulau Harapan and Pulau Panggang at the end of the planning period.
format Final Project
author Irene, Sally
spellingShingle Irene, Sally
MAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT
author_facet Irene, Sally
author_sort Irene, Sally
title MAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT
title_short MAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT
title_full MAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT
title_fullStr MAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT
title_full_unstemmed MAJOR OF ENVIRONMENTAL INFRASTRUCTURE ENGINEERING FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING, JL. RAYA JATINANGOR KM 20,75 SUMEDANG 45363 1SALLYIRENE@STUDENTS.ITB.AC.ID, 2BENNO@TL.ITB.AC.ID, 3WAHYU@TL.ITB.AC.ID ABSTRACT
title_sort major of environmental infrastructure engineering faculty of civil and environmental engineering, jl. raya jatinangor km 20,75 sumedang 45363 1sallyirene@students.itb.ac.id, 2benno@tl.itb.ac.id, 3wahyu@tl.itb.ac.id abstract
url https://digilib.itb.ac.id/gdl/view/56358
_version_ 1822002339743006720