DESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY

Abstract. Padalarang SPA Area is planned to serve four villages in Padalarang District, namely Kertamulya Village, Padalarang Village, Kertajaya Village and Jayamekar Village with 100% collection planning and a 20-year planning period, from 2021 to 2041. Solid waste collection to the Padalarang SPA...

Full description

Saved in:
Bibliographic Details
Main Author: Yudi Ristanto, Arif
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/56413
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:56413
spelling id-itb.:564132021-06-22T12:17:56ZDESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY Yudi Ristanto, Arif Indonesia Final Project transfer station, waste treatment, compaction, composting, recycle INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/56413 Abstract. Padalarang SPA Area is planned to serve four villages in Padalarang District, namely Kertamulya Village, Padalarang Village, Kertajaya Village and Jayamekar Village with 100% collection planning and a 20-year planning period, from 2021 to 2041. Solid waste collection to the Padalarang SPA Area is carried out by fixed container system or door to door Stationary Container System (SCS). The sorting system at selected sources is separating food waste and garden waste from other types of waste, centralized waste processing in SPA (centralization), organic waste processing using aerobic methods, namely windrow composting, and inorganic waste processing using physical methods. Waste processing with 100% collection and transportation rate, 15% reduction, the waste that enters the Padalarang SPA Area in 2041 is planned to be 185.61 tonnes/day. Paper, metal, and residue waste are processed by compaction (paper 4.59 tonnes/day, metal 0.13 tonnes/day, residue 166.05 tonnes/day). Recycled plastic waste with economic value is processed by shredding, washing, and drying the plastic (1.4 tons/day). Food waste and compostable garden waste are processed by composting by windrow (12.38 tons/day). The total minimum land requirement is 4032 m2. The calculation of the investment cost (CAPEX) required is IDR 25.286.729.000. Meanwhile, the required operational cost (OPEX) is IDR 43.003.411.459 per year. So that the NPV value is> 0, the waste management cost is IDR 618.232 per ton. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Abstract. Padalarang SPA Area is planned to serve four villages in Padalarang District, namely Kertamulya Village, Padalarang Village, Kertajaya Village and Jayamekar Village with 100% collection planning and a 20-year planning period, from 2021 to 2041. Solid waste collection to the Padalarang SPA Area is carried out by fixed container system or door to door Stationary Container System (SCS). The sorting system at selected sources is separating food waste and garden waste from other types of waste, centralized waste processing in SPA (centralization), organic waste processing using aerobic methods, namely windrow composting, and inorganic waste processing using physical methods. Waste processing with 100% collection and transportation rate, 15% reduction, the waste that enters the Padalarang SPA Area in 2041 is planned to be 185.61 tonnes/day. Paper, metal, and residue waste are processed by compaction (paper 4.59 tonnes/day, metal 0.13 tonnes/day, residue 166.05 tonnes/day). Recycled plastic waste with economic value is processed by shredding, washing, and drying the plastic (1.4 tons/day). Food waste and compostable garden waste are processed by composting by windrow (12.38 tons/day). The total minimum land requirement is 4032 m2. The calculation of the investment cost (CAPEX) required is IDR 25.286.729.000. Meanwhile, the required operational cost (OPEX) is IDR 43.003.411.459 per year. So that the NPV value is> 0, the waste management cost is IDR 618.232 per ton.
format Final Project
author Yudi Ristanto, Arif
spellingShingle Yudi Ristanto, Arif
DESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY
author_facet Yudi Ristanto, Arif
author_sort Yudi Ristanto, Arif
title DESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY
title_short DESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY
title_full DESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY
title_fullStr DESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY
title_full_unstemmed DESIGN OF TRANSFER STATION IN PADALARANG DISTRICT, WEST BANDUNG REGENCY
title_sort design of transfer station in padalarang district, west bandung regency
url https://digilib.itb.ac.id/gdl/view/56413
_version_ 1822274576405495808