DEVELOPMENT OF REACTIVE SCHEDULING MODEL WITH ROBUSTNESS PERFORMANCE CRITERIA TO MINIMIZE MACHINE BREAKDOWN
The pre-planned initial schedule when executed to the production floor had poor performance. This is because the initial schedule does not take into account unexpected disturbance such as machine breakdown so that schedule improvements are needed to make it more feasible to execute. This study tries...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/56928 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |