DEVELOPMENT OF REACTIVE SCHEDULING MODEL WITH ROBUSTNESS PERFORMANCE CRITERIA TO MINIMIZE MACHINE BREAKDOWN
The pre-planned initial schedule when executed to the production floor had poor performance. This is because the initial schedule does not take into account unexpected disturbance such as machine breakdown so that schedule improvements are needed to make it more feasible to execute. This study tries...
Saved in:
Main Author: | Mahmud, Hildawati |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/56928 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INTEGRATION MODEL OF BATCH SCHEDULING ON SINGLE BATCH PROCESSOR WITH MAINTENANCE SCHEDULING TO MINIMIZE SAVING, SETUP, MAINTENANCE, AND REWORK COSTS
by: Kurnia Ramadhani, Indah -
KRIGING-BASED INFILL CRITERIA FOR EXPENSIVE OPTIMIZATION IN AEROSPACE PROBLEMS
by: Daffa Robani, Muhammad -
SCHEDULING BASED REGENERATIVE BRAKING ENERGY OPTIMIZATION FOR PERFORMANCE EFFICIENCY OF TANGERANG-DURI CORRIDOR ELECTRIC RAIL TRAIN WITH GENETIC ALGORITHM METHOD
by: Sobar Muhamad Fatoni, Maskuri -
CRITERIA ANALYSIS FOR TRUCK HD465-7 AS A GUIDELINE FOR SAFETY MINE HAUL ROAD DESIGN.
by: Nur Ramadhan, Zakiy -
BACTH SCHEDULING MODEL FOR 2 DIMENSION NESTING PROCESS
by: Luqman, Muhammad