CHALLENGES AND STRATEGIES IN IMPLEMENTING DESIGN BUILD AT SEMANGGI INTERCHANGE PROJECT
Infrastructure construction that rising in Indonesia, especially public infrastructure, requires project delivery system(PDS). Project delivery systemis a system chosen by the owner to regulate the relationship and role between parties that involved with the owner. The most commonly use PDS are DBB...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57099 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!