CHALLENGES AND STRATEGIES IN IMPLEMENTING DESIGN BUILD AT SEMANGGI INTERCHANGE PROJECT
Infrastructure construction that rising in Indonesia, especially public infrastructure, requires project delivery system(PDS). Project delivery systemis a system chosen by the owner to regulate the relationship and role between parties that involved with the owner. The most commonly use PDS are DBB...
Saved in:
Main Author: | Damayanti, Nabillah |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57099 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF THE CONSTRUCTION MANAGEMENT ASPECT OF THE KARAWANG TOLL ACCESS (INTERCHANGE) PROJECT
by: Fikri Akbar, Alfredo -
DESIGN-BUILD IMPLEMENTATION STRATEGY IN THE ADMINISTRATION OF INFRASTRUCTURE PROJECT IN WEST JAVA PROVINCE
by: Nur Afni, Fatmawati -
DESIGN OF EMBANKMENT, BORED PILES FOUNDATION, AND ABUTMENT ANALYSIS FOR INTERCHANGE KARAWANG
by: Putra Sri Kasta, Galih -
STUDY THE IMPLEMENTATION OF SUSTAINABLE CONSTRUCTION IN BUILDING PROJECT
by: AULIA MUTIANISA, MIFNA -
THE CHALLENGES OF IMPLEMENTATION OF TEMPORARAY OCCUPATION PERMIT (SLF) FOR BUILDING IN BANDUNG CITY
by: Is Aziza, Mona