DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE

Indonesia has great potential in New Renewable Energy (NRE). Nowadays, the development of EBT is expedited so it can substitute fossil energy. However, the number of EBT is bounded by the energy potential in a region. One of several ways to maximize the production of NRE is by developing a hybrid sy...

Full description

Saved in:
Bibliographic Details
Main Author: Ridho Rizki, Asyraf
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/57121
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:57121
spelling id-itb.:571212021-07-27T15:01:32ZDEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE Ridho Rizki, Asyraf Indonesia Final Project New Renewable Energy (NRE), hybrid system, smart microgrid, dam, floating solar PV INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/57121 Indonesia has great potential in New Renewable Energy (NRE). Nowadays, the development of EBT is expedited so it can substitute fossil energy. However, the number of EBT is bounded by the energy potential in a region. One of several ways to maximize the production of NRE is by developing a hybrid system. In order to make the hybrid system operate correctly, the smart microgrid is required to know the number of loads needed and the energy management system. In this research, the reviewed location is East Nusa Tenggara (NTT) Province due to this region has a low electrification ratio. Based on the NRE potential in NTT, a hybrid hydro and solar power plant system is developed in this research with generator biodiesel (B30) support to increase the reliability of the system. The implementation of this hybrid system is floating solar PV in a dam. In the process, the development of a hybrid system uses the HOMER Pro software by comparing all the possible configurations for a hybrid system. Furthermore, this research also compares several simple schemes for controlling the hydro energy based on the result of dependable discharge calculation using F. J. Mock method. Moreover, the economic variable also becomes the consideration parameter in the development. Based on the simulation and optimization from HOMER Pro, the most optimal system consists of 2.6 MW hydro energy, 14.45 MWP solar PV, 14 MW biodiesel generator, and 31.0 MWh li-Ion battery to fulfill 99,048.6 kWh total load each day with load following control dispatch as the energy management system. This system has a 90.75% renewable fraction. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia has great potential in New Renewable Energy (NRE). Nowadays, the development of EBT is expedited so it can substitute fossil energy. However, the number of EBT is bounded by the energy potential in a region. One of several ways to maximize the production of NRE is by developing a hybrid system. In order to make the hybrid system operate correctly, the smart microgrid is required to know the number of loads needed and the energy management system. In this research, the reviewed location is East Nusa Tenggara (NTT) Province due to this region has a low electrification ratio. Based on the NRE potential in NTT, a hybrid hydro and solar power plant system is developed in this research with generator biodiesel (B30) support to increase the reliability of the system. The implementation of this hybrid system is floating solar PV in a dam. In the process, the development of a hybrid system uses the HOMER Pro software by comparing all the possible configurations for a hybrid system. Furthermore, this research also compares several simple schemes for controlling the hydro energy based on the result of dependable discharge calculation using F. J. Mock method. Moreover, the economic variable also becomes the consideration parameter in the development. Based on the simulation and optimization from HOMER Pro, the most optimal system consists of 2.6 MW hydro energy, 14.45 MWP solar PV, 14 MW biodiesel generator, and 31.0 MWh li-Ion battery to fulfill 99,048.6 kWh total load each day with load following control dispatch as the energy management system. This system has a 90.75% renewable fraction.
format Final Project
author Ridho Rizki, Asyraf
spellingShingle Ridho Rizki, Asyraf
DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE
author_facet Ridho Rizki, Asyraf
author_sort Ridho Rizki, Asyraf
title DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE
title_short DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE
title_full DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE
title_fullStr DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE
title_full_unstemmed DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE
title_sort development of hybrid hydro, solar, and biodiesel (b30) smart microgrid power plant system in temef dam east nusa tenggara province
url https://digilib.itb.ac.id/gdl/view/57121
_version_ 1822930374606454784