DEVELOPMENT OF HYBRID HYDRO, SOLAR, AND BIODIESEL (B30) SMART MICROGRID POWER PLANT SYSTEM IN TEMEF DAM EAST NUSA TENGGARA PROVINCE
Indonesia has great potential in New Renewable Energy (NRE). Nowadays, the development of EBT is expedited so it can substitute fossil energy. However, the number of EBT is bounded by the energy potential in a region. One of several ways to maximize the production of NRE is by developing a hybrid sy...
Saved in:
Main Author: | Ridho Rizki, Asyraf |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/57121 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN AND NUMERICAL SIMULATION OF A 1 MW FRANCIS TURBINE FOR THE TEMEF DAM IN EAST NUSA TENGGARA
by: Firdaus, Wildan -
WATER AVAILABILITY STUDY AT DAM RAKNAMO (PLAN) IN KUPANG REGENCY EAST NUSA TENGGARA PROVINCE
by: Gomeks (NIM 95005309), Johanes -
STUDY OF POWER QUALITY IN MICROGRID BASED ON SOLAR/MICRO-HYDRO/WIND POWER PLANT FOR ISOLATED AREA
by: Sahidin, Dwi -
FINANCIAL ANALYSIS OF SOLAR POWER PLANT DEVELOPMENT IN MANATANG VILLAGE EAST NUSA TENGGARA PROVINCE
by: CATUR PRASETYO (NIM 29115014), INDRA -
STUDY EVALUATION OF OELTUA DAM IN KUPANG REGENCY, NUSA TENGGARA TIMUR
by: Losiana, Kania