EVALUATION OF ALTERNATIVE SOLUTIONS TO RECOVER DEFERRED OIL PRODUCTION DUE TO FACILITY CONSTRAINT: CASE STUDY OF BRAVO GATHERING STATION, PT. CPI

For more than 90 years, CPI has been the leading energy company and regarded as one of the highest oil-producing contractors in Indonesia. Bravo is one of PT. CPI's biggest oil fields where the produced fluid from this field is processed at Bravo Gathering Station (GS). Lately, Bravo GS has b...

Full description

Saved in:
Bibliographic Details
Main Author: Fadli, Ade
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/57181
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia