EVALUATION OF ALTERNATIVE SOLUTIONS TO RECOVER DEFERRED OIL PRODUCTION DUE TO FACILITY CONSTRAINT: CASE STUDY OF BRAVO GATHERING STATION, PT. CPI
For more than 90 years, CPI has been the leading energy company and regarded as one of the highest oil-producing contractors in Indonesia. Bravo is one of PT. CPI's biggest oil fields where the produced fluid from this field is processed at Bravo Gathering Station (GS). Lately, Bravo GS has b...
Saved in:
Main Author: | Fadli, Ade |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57181 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATING ALTERNATIVES ON LOSS PRODUCTION OPPORTUNITY DUE TO SURFACE FACILITY CONSTRAINT: CASE STUDY OF ANOA & PESUT GATHERING STATION IN PT RCI
by: Alfian Rahmanto, Bayu -
DECISION ANALYSIS OF ABANDONMENT AND SITE RETIREMENT FOR SAND PLANT FACILITIES GATHERING STATION PT PERTAMINA HULU ROKAN
by: Rekso Tinamtu, Ali -
PROJECT INVESTMENT ANALYSIS AND FIELD DEVELOPMENT STRATEGY FOR KAPPA FIELD - BRAVO RESERVOIR
by: Anggaraini, Hanny -
DECISION MAKING TO IMPROVE RELIABILITY WATER INJECTION PUMP AT PH GATHERING STATION PT. ABC
by: Eko Prasetyo, M. -
PROACTIVE JOB OPTIMIZATION IN HEAVY OIL ASSET OPTIMIZATION TEAM PT CPI
by: Aji, Muhamad