DESAIN STIMULASI DENGAN METODE AIR COMPRESSION PADA SUMUR GEOTERMAL DOMINASI AIR
By the time the wellhead was opened after well testing, often fluid can not flow naturally to the surface so it takes extra effort to discharge the well, usually occurs in water-dominated system. It is usually due to the water column above the permeable zone so that makes hydrostatic pressure in the...
Saved in:
Main Author: | Chessie C, Natassha |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57308 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESAIN DAN KEDALAMAN PEMASANGAN CASING DARI SUMUR PRODUKSI X PADA SISTEM GEOTERMAL DOMINASI AIR DENGAN TEMPERATUR RESERVOIR 330 °C
by: Bagas Sri Hartono, Lucky -
DESAIN DAN PENENTUAN KEDALAMAN CASING SUMUR PRODUKSI PADA SISTEM PANAS BUMI DOMINASI AIR DI LAPANGAN X
by: Wicaksono Ramas, Erick -
PENINGKATAN PERHITUNGAN BEBAN PERFORATED LINER DALAM SUMUR PRODUKSI GEOTERMAL
by: Ramasurya Wony's, Alfredo -
IDENTIFIKASI KEGAGALAN CASING PADA SUMUR GEOTERMAL BERSTATUS ABANDONED DI LAPANGAN X, INDONESIA
by: Adi Wicaksana, Artahsasta -
PREDIKSI KEMAMPUAN PRODUKSI SUMUR GEOTERMAL DENGAN MEMPERHITUNGKAN ADANYA KANDUNGAN NON-CONDENSABLE GAS DALAM FLUIDA
by: Ramadhan Yoan M, Mochamad