DECISION MAKING TO DETERMINE BEST ALTERNATIVE TO PREVENT PRODUCTION LOSS RELATED TO VAPOR RECOVERY UNIT (VRU) DOWNTIME AT PT XYZ INDONESIA
Currently, PTN Gas Plant processes associated gas from the gas boot of PTN Gathering Station. The associated gas is processed through the Vapor Recovery Unit (VRU) gas compressor before further handled by the larger AWE gas compressor. After the gas is compressed, cooled and separated it is then...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/57410 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |