PERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA

PT ABC is an andesite mining company located in Bogor Regency, West Java with a production target of 121,577 tons in October 2020. During October and several months in 2020, the production target was not achieved. The study carried out on bench 9 found that there was a long waiting time for the a...

Full description

Saved in:
Bibliographic Details
Main Author: Ramadhon, Ahmad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/57584
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:57584
spelling id-itb.:575842021-08-25T10:51:06ZPERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA Ramadhon, Ahmad Indonesia Final Project Production, Match Factor, Hauling Road Grade, Rolling Resistance INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/57584 PT ABC is an andesite mining company located in Bogor Regency, West Java with a production target of 121,577 tons in October 2020. During October and several months in 2020, the production target was not achieved. The study carried out on bench 9 found that there was a long waiting time for the arrival of the hauling units when broken rock was hauled to plant A. Therefore, in this research, a study which produces alternative improvements to production activities in order to reach the company’s targets will be conducted. The data taken by direct observation in the field are cycle time, the number of loading and hauling units used and the hauling distance. Meanwhile, data of haul road conditions, available working hours, production targets, and units specifications are obtained from PT ABC and literatures. After calculating the actual condition, the production activities of loading unit, hauling units and match factors are 358.73 tons/hour (119% target), 227.03 tons/hour (75% target), and 0.63 respectively. It can be seen that the hauling activity is the cause of the problem. Therefore, 3 evaluations that will be carried out in this study, namely they are decreasing the road grade only, decreasing the road rolling resistance only, and decreasing the grade and rolling resistance of the road. This evaluation is aimed to reduce the hauling time of both loaded and empty. Based on the evaluation results, the estimated production and match factor are as follows: 230.67 tons/hour (76% target) and 0.64 respectively, if decreasing the road grade only; 293.58 tons/hour (97% target) and 0.82 respectively, if decreasing road rolling resistance only; 268.61 tons/hour (89% target) and 0.75 respectively, if decreasing the grade and rolling resistance. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT ABC is an andesite mining company located in Bogor Regency, West Java with a production target of 121,577 tons in October 2020. During October and several months in 2020, the production target was not achieved. The study carried out on bench 9 found that there was a long waiting time for the arrival of the hauling units when broken rock was hauled to plant A. Therefore, in this research, a study which produces alternative improvements to production activities in order to reach the company’s targets will be conducted. The data taken by direct observation in the field are cycle time, the number of loading and hauling units used and the hauling distance. Meanwhile, data of haul road conditions, available working hours, production targets, and units specifications are obtained from PT ABC and literatures. After calculating the actual condition, the production activities of loading unit, hauling units and match factors are 358.73 tons/hour (119% target), 227.03 tons/hour (75% target), and 0.63 respectively. It can be seen that the hauling activity is the cause of the problem. Therefore, 3 evaluations that will be carried out in this study, namely they are decreasing the road grade only, decreasing the road rolling resistance only, and decreasing the grade and rolling resistance of the road. This evaluation is aimed to reduce the hauling time of both loaded and empty. Based on the evaluation results, the estimated production and match factor are as follows: 230.67 tons/hour (76% target) and 0.64 respectively, if decreasing the road grade only; 293.58 tons/hour (97% target) and 0.82 respectively, if decreasing road rolling resistance only; 268.61 tons/hour (89% target) and 0.75 respectively, if decreasing the grade and rolling resistance.
format Final Project
author Ramadhon, Ahmad
spellingShingle Ramadhon, Ahmad
PERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA
author_facet Ramadhon, Ahmad
author_sort Ramadhon, Ahmad
title PERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA
title_short PERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA
title_full PERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA
title_fullStr PERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA
title_full_unstemmed PERFORMANCE STUDY OF LOADING AND HAULING AT THE ANDESITE QUARRY OF PT ABC, BOGOR REGENCY, WEST JAVA
title_sort performance study of loading and hauling at the andesite quarry of pt abc, bogor regency, west java
url https://digilib.itb.ac.id/gdl/view/57584
_version_ 1822930508009439232