OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS

X field is gas field with 12.6% recovery factor. New field development contract has been agreed for 15 years with buyer availability option in 3 years,5 years, or 10 years plateau rate time. Goal of study is to determine most economical plateau rate and plateau rate time using reservoir simulation t...

Full description

Saved in:
Bibliographic Details
Main Author: Irawan, Rian
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/57607
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia