OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS

X field is gas field with 12.6% recovery factor. New field development contract has been agreed for 15 years with buyer availability option in 3 years,5 years, or 10 years plateau rate time. Goal of study is to determine most economical plateau rate and plateau rate time using reservoir simulation t...

Full description

Saved in:
Bibliographic Details
Main Author: Irawan, Rian
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/57607
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:57607
spelling id-itb.:576072021-08-25T13:04:54ZOPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS Irawan, Rian Indonesia Final Project production optimization, plateau rate time, production facility, economy INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/57607 X field is gas field with 12.6% recovery factor. New field development contract has been agreed for 15 years with buyer availability option in 3 years,5 years, or 10 years plateau rate time. Goal of study is to determine most economical plateau rate and plateau rate time using reservoir simulation to predict field production in which intergrated with designing production facility based on gas characteristics and production rate each scenario and last is economic calculation refer to development scenario. In place matching and history matching process resulting that reservoir simulation model is representative enough. Field development conducted by opening 7 layer through 4 wells workover job. From reservoir simulation results, target of 3 years plateau rate time is reached by 8.3 MMSCFD plateau rate with 29.54% recovery factor,while the 5 years target is reached by 5.55 MMSCFD plateau rate with 29.34% recovery factor and the 10 years target is reached by 3.05 MMSCFD plateau rate with 28.99% recovery factor.Production facility design requires the gas separation, gas sweetening, gas dehydration dan HC dew point control systems. Based on economic analysis, the scenario of 3 years plateau rate time is the most economical scenario. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description X field is gas field with 12.6% recovery factor. New field development contract has been agreed for 15 years with buyer availability option in 3 years,5 years, or 10 years plateau rate time. Goal of study is to determine most economical plateau rate and plateau rate time using reservoir simulation to predict field production in which intergrated with designing production facility based on gas characteristics and production rate each scenario and last is economic calculation refer to development scenario. In place matching and history matching process resulting that reservoir simulation model is representative enough. Field development conducted by opening 7 layer through 4 wells workover job. From reservoir simulation results, target of 3 years plateau rate time is reached by 8.3 MMSCFD plateau rate with 29.54% recovery factor,while the 5 years target is reached by 5.55 MMSCFD plateau rate with 29.34% recovery factor and the 10 years target is reached by 3.05 MMSCFD plateau rate with 28.99% recovery factor.Production facility design requires the gas separation, gas sweetening, gas dehydration dan HC dew point control systems. Based on economic analysis, the scenario of 3 years plateau rate time is the most economical scenario.
format Final Project
author Irawan, Rian
spellingShingle Irawan, Rian
OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS
author_facet Irawan, Rian
author_sort Irawan, Rian
title OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS
title_short OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS
title_full OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS
title_fullStr OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS
title_full_unstemmed OPTIMASI PLATEAU RATE TIME PADA PENGEMBANGAN LAPANGAN GAS
title_sort optimasi plateau rate time pada pengembangan lapangan gas
url https://digilib.itb.ac.id/gdl/view/57607
_version_ 1822274962553044992