POSSIBILITY ANALYSIS OF APPLICATION OF FREE GOVERNOR OPERATION MODE IN WAYANG WINDU'S GEOTHERMAL POWER PLANT
Saved in:
Main Author: | Al Fatih, Muhamad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57767 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF GEOTHERMAL STEAM PURITY IN GEOTHERMAL POWER PLANT
by: Wilantara, Bayu -
OPERATIONAL PARAMETER DESIGN OF ADDITIONAL COOLING TOWER TO OPTIMIZE PATUHA GEOTHERMAL POWER PLANT POWER GENERATION
by: Hilman Alfajri, Muhammad -
Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
by: Setiadi, Farid -
MAPPING OF THE LUMUT BALAI GEOTHERMAL POWER PLANT (GPP)
by: Mabruroh, Silvia -
UNIT 2 KAMOJANG GEOTHERMAL POWER PLANT UP-RATED
by: Ambarita, Ervant