OPTIMAL SCHEDULING ALGORITHM FOR COAL-POWERED POWER PLANTS â CONSIDERING COAL DELIVERY CONSTRAINTS
Electricity generation in Indonesia is still dominated 43,64% by coal power plants, most of which operate on the island of Java but use coal transported from other islands. As an archipelagic country, sea condition often contribute to the non-optimal scheduling of power plant operations. Because...
Saved in:
Main Author: | Adjie Brotosukmono, Harso |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59462 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PIT OPTIMIZATION AND SCHEDULING COAL MINES PT XYZ
by: Adjie Pramudya, Danung -
OPTIMIZATION ON COAL SUPPLY ALLOCATION FOR COALFIRED POWER PLANTS IN INDONESIA
by: Naomi Hotmauli, Murni -
OPTIMIZATION OF COAL PROCUREMENT NETWORK USING COAL BLENDING METHOD TO MEET THE NEEDS OF POWER PLANT (PLTU)
by: Imaduddin, Muhammad -
LOCATION MODEL OF COAL BLENDING FACILITIES TO ENSURE COAL SUPPLY FOR COAL FIRED POWER PLANTS IN JAVA ISLAND
by: Ikhsan Pratama, Hanif -
TRANSMISSION LINE PLANNING FOR INDONESIA'S NEW CAPITAL CITY USING SUCCESIVE REMOVAL METHOD
by: Adjie Brotosukmono, Harso