PERFORMANCE EVALUATION OF PROJECT MANAGEMENT USING SYSTEM DYNAMIC APPROACH, CASE STUDY: THE EPCC LNG FILLING STATION CARGO DOCK PROJECT
Time delays are a common phenomenon in construction projects. The Engineering, Procurement, Construction, Commissioning (EPCC) LNG Filling Station Cargo Dock Project, the second company service in the technical service business segment in EPCC Project, was delayed by 8.98% at the end of the proje...
Saved in:
Main Author: | Candra, Maulani |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/59577 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DECISION QUALITY EVALUATION IN PROJECT MANAGEMENT (CASE STUDY: PROJECT X OF BADAK LNG)
by: Nurkamal Pratama, Irfan -
INVESTMENT DECISION ANALYSIS OF BONTANG LNG HUB PROJECT
by: Permana, Dedi -
FINANCIAL FEASIBILITY STUDY OF LNG DISTRIBUTION AND REGASIFICATION PROJECT TO PLN JERANJANG
by: Yoga Saryanto, Widhi -
PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
by: Anggoro, Prastiwo -
INVESTMENT ANALYSIS ON LIQUEFIED NATURAL GAS PROJECT (A CASE STUDY IN LNG COMPANY)
by: Erdian, Oldy