DESIGN OF PERFORMANCE MANAGEMENT SYSTEM FOR PRODUCTION BUSINESS PROCESS IN KALTIM 5 PLANT OF PT PUPUK KALIMANTAN TIMUR USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM APPROACH
Plant 5 Operation Department or well known as Kaltim 5 Plant is the newest and biggest Ammonia & Urea production facility owned by PT. Pupuk Kalimantan Timur and Indonesia. As the biggest production facilities, Kaltim 5 should perform as well both financial and nonfinancial perspective. Curre...
Saved in:
Main Author: | Fahmi, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/59578 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSED PERFORMANCE MANAGEMENT SYSTEM IMPLEMENTATION WITH INTEGRATED PERFORMANCE MANAGEMENT SYSTEM (IPMS) FOR PT. PUSATEX
by: Fahmi Shahab, Muhammad -
REDUCING UNPLANNED DOWNTIME FOR UREA PLANT-5 PT. PUPUK KALIMANTAN TIMUR
by: Dhyatmiko Arifianto, Rikho -
KNOWLEDGE MANAGEMENT MATURITY ASSESSMENT TO IDENTIFY OPPORTUNITY FOR IMPROVEMENT AT PT PUPUK KALTIM
by: Dzulqarnain, Iskandar -
INCREASING THE ADOPTION OF PERFORMANCE MANAGEMENT APPLICATION AT PT. KALTIM PRIMA COAL
by: Freddy Manurung, Ronald -
PETROCHEMICAL BUSINESS PROJECT FEASIBILITY STUDY (CASE STUDY: DME PLANT OF PT PUPUK KALIMANTAN TIMUR)
by: Rois, Achmad