RELIABILITY-CENTERED MAINTENANCE ANALYSIS STUDY CASE ON VITAL EQUIPMENT AMMONIA PLANT 1A PT PUPUK KUJANG CIKAMPEK.
Saved in:
Main Author: | Jauhari Roesdha, Iqbal |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59859 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS KEGAGALAN REBOILER 1114-CA PABRIK AMMONIA PT. PUPUK KUJANG CIKAMPEK
by: Hardjono, Priatmo -
ANALISIS KEGAGALAN REBOILER 1114-CA PABRIK AMMONIA PT. PUPUK KUJANG CIKAMPEK
by: Hardjono, Priatmo -
Analisis dampak penerapan subsidi pupuk terhadap kelayakan investasi kujang 1B :: Studi kasus di PT Pupuk Kujang Cikampek
by: , BUDHIYATI, Farida, et al.
Published: (2006) -
INVESTMENT FINANCING ANALYSIS FOR INCINERATOR PLANT AT PT.KAWASAN INDUSTRI KUJANG CIKAMPEK
by: Narulita, Shinta -
ANALISA KERUSAKAN HIGH SPEED SHAFT POMPA UGA-502-AB DI PT. PUPUK KUJANG, CIKAMPEK
by: , CHANDRA NUR FATAH. AF, et al.
Published: (2013)