OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR
The increasing demand for Ammonia production requires innovative approaches to ensure equipment reliability and operational efficiency in its production facility. This study employs a multi-faceted approach to address the challenges associated with the reliability of Semi Lean Pump 107-JB in Ammo...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/78948 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |