OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR

The increasing demand for Ammonia production requires innovative approaches to ensure equipment reliability and operational efficiency in its production facility. This study employs a multi-faceted approach to address the challenges associated with the reliability of Semi Lean Pump 107-JB in Ammo...

Full description

Saved in:
Bibliographic Details
Main Author: Priyambudi, Anindito
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/78948
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:78948
spelling id-itb.:789482023-11-27T08:40:02ZOPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR Priyambudi, Anindito Manajemen umum Indonesia Theses Equipment Reliability, Kepner-Tregoe Decision Analysis Method, Overall Equipment Effectiveness (OEE), IoT Probe Sensors, Maintenance Strategy INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/78948 The increasing demand for Ammonia production requires innovative approaches to ensure equipment reliability and operational efficiency in its production facility. This study employs a multi-faceted approach to address the challenges associated with the reliability of Semi Lean Pump 107-JB in Ammonia Plant 2 of PT Pupuk Kalimantan Timur, a critical equipment in its production facility. Utilizing the Kepner-Tregoe Decision Analysis Method, the study evaluates various alternative solutions to enhance the pump's reliability and overall equipment effectiveness (OEE). The research identifies the root causes of the pump's low reliability, indicated by its declining OEE from 2021-2022. It is done through a series of OEE calculations, 6 Big Losses analysis, and Current Reality Tree analysis. Four major phenomena contributed to the issue: inadequate maintenance procedures and equipment, pump operation beyond its design capacity, insufficient training and competency of manpower, and improper material selection and compatibility testing. The study employs a combination of SCAMPER techniques and the Kepner-Tregoe Decision Analysis framework to develop feasible alternative solutions, which categorizes evaluation criteria into 'Musts' and 'Wants.' Factors such as cost, feasibility, and potential impact on OEE are assessed. Among the alternatives evaluated, implementing IoT Probe Sensors for real-time monitoring emerged as the most effective solution, addressing the research objective. The thesis culminates in the development and execution of a Maintenance Implementation Plan, which is subsequently assessed through OEE performance metrics. Postimplementation, the Semi Lean Pump 107-JB is estimated to experience increase in OEE from 63.63% in 2022 to 96.74% in 2024, significantly reducing downtime and contributing an estimated savings of $12.6 million to the company. The research provides actionable insights for improving Semi Lean Pump 107-JB's reliability. It offers a structured methodology for evaluating alternative solutions for similar applications in industrial settings, particularly rotating equipment in the petrochemical industry. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Priyambudi, Anindito
OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR
description The increasing demand for Ammonia production requires innovative approaches to ensure equipment reliability and operational efficiency in its production facility. This study employs a multi-faceted approach to address the challenges associated with the reliability of Semi Lean Pump 107-JB in Ammonia Plant 2 of PT Pupuk Kalimantan Timur, a critical equipment in its production facility. Utilizing the Kepner-Tregoe Decision Analysis Method, the study evaluates various alternative solutions to enhance the pump's reliability and overall equipment effectiveness (OEE). The research identifies the root causes of the pump's low reliability, indicated by its declining OEE from 2021-2022. It is done through a series of OEE calculations, 6 Big Losses analysis, and Current Reality Tree analysis. Four major phenomena contributed to the issue: inadequate maintenance procedures and equipment, pump operation beyond its design capacity, insufficient training and competency of manpower, and improper material selection and compatibility testing. The study employs a combination of SCAMPER techniques and the Kepner-Tregoe Decision Analysis framework to develop feasible alternative solutions, which categorizes evaluation criteria into 'Musts' and 'Wants.' Factors such as cost, feasibility, and potential impact on OEE are assessed. Among the alternatives evaluated, implementing IoT Probe Sensors for real-time monitoring emerged as the most effective solution, addressing the research objective. The thesis culminates in the development and execution of a Maintenance Implementation Plan, which is subsequently assessed through OEE performance metrics. Postimplementation, the Semi Lean Pump 107-JB is estimated to experience increase in OEE from 63.63% in 2022 to 96.74% in 2024, significantly reducing downtime and contributing an estimated savings of $12.6 million to the company. The research provides actionable insights for improving Semi Lean Pump 107-JB's reliability. It offers a structured methodology for evaluating alternative solutions for similar applications in industrial settings, particularly rotating equipment in the petrochemical industry.
format Theses
author Priyambudi, Anindito
author_facet Priyambudi, Anindito
author_sort Priyambudi, Anindito
title OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR
title_short OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR
title_full OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR
title_fullStr OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR
title_full_unstemmed OPTIMIZING OVERALL EQUIPMENT EFFECTIVENESS USING KEPNER-TREGOE DECISION ANALYSIS: A CASE STUDY OF SEMI-LEAN PUMPS IN AMMONIA PLANT 2 OF PT PUPUK KALIMANTAN TIMUR
title_sort optimizing overall equipment effectiveness using kepner-tregoe decision analysis: a case study of semi-lean pumps in ammonia plant 2 of pt pupuk kalimantan timur
url https://digilib.itb.ac.id/gdl/view/78948
_version_ 1822008730689994752