PRELIMINARY DESIGN OF 83 KW MICRO-HYDRO POWER PLANT SYSTEM WITH UTILIZATION SUB WATERSHED OF ULEE GLE, BIREUEN REGENCY.

Saved in:
Bibliographic Details
Main Author: Fauzan Novaryanto, Rafif
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/59933
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items