SIMULATION OF FLUE GAS UTILIZATION OF BOTTOMING ORC FOR BANJARMASIN GAS TURBINE POWER PLANT
Saved in:
Main Author: | Pamungkas, Anjar |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59966 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RESEARCH ON LABORATORIUM SCALE GAS DESULFURIZATION AS BASIS FOR DRY FLUE GAS DESULFURIZATION FOR POWER PLANT
by: Arif Susetyo, Muhammad -
DESIGN OF FLUE GAS DESULFURIZATION AIR POLLUTION CONTROL ON INDRAMAYU POWER PLANT
by: Jamil, Muhammad -
SIMULATION AND OPTIMIZATION OF COMBINED CYCLE GAS TURBINE POWER PLANTS
by: LIU ZUMING
Published: (2019) -
EFFECTS OF FLUE GAS IMPURITIES ON CO2 UTILIZATION FOR PCC
by: Megananda Ganesha Widodo, Arya -
Utilization of leonardite, flue gas desulfurization gypsum and clay for production of ceramic plant growth material
by: Srisomang,R., et al.
Published: (2015)