PENGEMBANGAN METODE OPTIMASI INTERVAL PERAWATAN MESIN CFM56-3
Saved in:
Main Author: | Darmadi, Pandu |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60779 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS DEGRADASI EGT MARTIN MESIN CFM56-3 B737-300/400/500.
by: Mahendra Nur, Fabian -
ANALISIS KEGAGALAN ENGINE STARTER VALVE MESIN CFM56-3 BOEING 737-300/400/500
by: Kurnia Chandra, Ricky -
Development of CFM56 ballscrew actuators cell
by: Boo, Wei Wen.
Published: (2013) -
ANALYSIS OF EGT MARGIN DEGRADATION ENGINE CFM56-3 BOEING 737-300/400/500
by: MAHENDRA NUR (NIM : 13107044); Pembimbing 1: Dr. Ir. Arief Hariyanto ; Pembimbing 2 : Dr. I, FABIAN -
ANALISIS PENYEBAB DELAMINASI STRUKTUR SANDWICH INNER DUCT WALL THRUST REVERSER ENGINE CFM56-3
by: Hartanto, Diki