PENGEMBANGAN ALAT BANTU PERENCANAAN KAPASITAS PERAWATAN DENGAN METODE MODEL ANTRIAN
Human resources are the spearhead in the maintenance system. Maintenance capacity planning is needed to determine the optimal level of resources to meet the forecasted maintenance load that produce a minimum total cost. Observations in the current market show that there is no capacity planning tool...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62000 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |