STUDI MODIFIKASI SISTEM KONDENSER DAN COOLING TOWER UNTUKMENINGKATKAN DAYA TURBIN SEBUAH PLTP.
Saved in:
Main Author: | Asmoro Bahar, Agung |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60865 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
by: ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG -
DESAIN SISTEM PENGENDALIAN LEVEL DAN TEMPERATUR AIR KOLAM KONDENSER DAN COOLING TOWER PADA MINI POWER PLANT BERKAPASITAS 1 MW
by: , HORNA YOSI WIDYANITA GULTOM, et al.
Published: (2014) -
ANALISIS KINERJA EJEKTOR UNTUK EKSTRAKSI UAP KONDENSER UTAMA PADA PLTP 25 MW PT GEO DIPA ENERGI Ltd. DIENG
by: , RAHADIAN KUSUMA ADI PRATAMA, et al.
Published: (2013) -
KAJIAN TERMODINAMIKA DISTRIBUSI DAYA LISTRIK TURBIN UNIT 3 PADA PLTP GUNUNG SALAK
by: Chendra, Mahendrata -
Rancangbangun Busing Kondenser Tegangan Tinggi.
by: Perpustakaan UGM, i-lib
Published: (1987)