DESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA
Currently, the development of business hotels in Indonesia is growing rapidly along with the increase of business development, especially in the Jakarta area, which is known as the business city center in Indonesia. With many companies growing in the area, business hotels have become quite attrac...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/61227 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:61227 |
---|---|
spelling |
id-itb.:612272021-09-24T09:44:14ZDESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA Suris Kusuma, Leonardo Teknik sipil Indonesia Final Project construction delivering method, cost estimation, scheduling, project cost estimation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/61227 Currently, the development of business hotels in Indonesia is growing rapidly along with the increase of business development, especially in the Jakarta area, which is known as the business city center in Indonesia. With many companies growing in the area, business hotels have become quite attractive to entrepreneurs for business activities. The 4-star Business Hotel Project in Slipi is a hotel project designed to accommodate lodging and other services that can facilitate business activities in the Jakarta area. This building has a main function as a commercial area that provides lodging facilities as well as supporting and recreational facilities for business activities with a total height of 61 meters consisting of 13 floors, a rooftop, and 2 basement floors. In this case, construction management engineering is needed to plan the project delivering methods, estimate project cost and schedule of the project so the project will meet the targets, which are time, cost and quality. In this paper, writer will explain about the construction delivering methods that is in accordance with the project conditions. This paper will explain the process of quanitity take off using Microsoft Excel, conducting direct and indirect cost and the process to get the project duration. Then, this project plan will be analysed based on one similar project data so It will meet the project targets which is 17 months of project duration and Rp 142 billion of project value. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik sipil |
spellingShingle |
Teknik sipil Suris Kusuma, Leonardo DESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA |
description |
Currently, the development of business hotels in Indonesia is growing
rapidly along with the increase of business development, especially in the Jakarta
area, which is known as the business city center in Indonesia. With many companies
growing in the area, business hotels have become quite attractive to entrepreneurs
for business activities. The 4-star Business Hotel Project in Slipi is a hotel project
designed to accommodate lodging and other services that can facilitate business
activities in the Jakarta area. This building has a main function as a commercial area
that provides lodging facilities as well as supporting and recreational facilities for
business activities with a total height of 61 meters consisting of 13 floors, a rooftop,
and 2 basement floors.
In this case, construction management engineering is needed to plan the
project delivering methods, estimate project cost and schedule of the project so the
project will meet the targets, which are time, cost and quality. In this paper, writer
will explain about the construction delivering methods that is in accordance with
the project conditions. This paper will explain the process of quanitity take off using
Microsoft Excel, conducting direct and indirect cost and the process to get the
project duration. Then, this project plan will be analysed based on one similar
project data so It will meet the project targets which is 17 months of project duration
and Rp 142 billion of project value. |
format |
Final Project |
author |
Suris Kusuma, Leonardo |
author_facet |
Suris Kusuma, Leonardo |
author_sort |
Suris Kusuma, Leonardo |
title |
DESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA |
title_short |
DESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA |
title_full |
DESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA |
title_fullStr |
DESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA |
title_full_unstemmed |
DESIGN OF 4-STAR BUSINESS HOTEL IN SLIPI, JAKARTA |
title_sort |
design of 4-star business hotel in slipi, jakarta |
url |
https://digilib.itb.ac.id/gdl/view/61227 |
_version_ |
1822003779973677056 |