#TITLE_ALTERNATIVE#

ABSTRACT: <br /> <br /> <br /> <br /> <br /> Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an importa...

Full description

Saved in:
Bibliographic Details
Main Author: Ismaya (NIM 12103005), Fitra
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6123
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:ABSTRACT: <br /> <br /> <br /> <br /> <br /> Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an important concern to the mining activities. Mining operation applies cut and fill stoping method. The mineout spaces in the stope are back filled with slurry (60percent solid) from processing plants reject through piping system. Main access to reach mining area is using horizontal tunnel (adit) which called mine haulage level 500. The advance of mine operation applies the overhand method start from level 500, so that mine water and ground water will flow down and accumulated to MHL 500.