#TITLE_ALTERNATIVE#

ABSTRACT: <br /> <br /> <br /> <br /> <br /> Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an importa...

Full description

Saved in:
Bibliographic Details
Main Author: Ismaya (NIM 12103005), Fitra
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6123
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:6123
spelling id-itb.:61232017-09-27T10:39:01Z#TITLE_ALTERNATIVE# Ismaya (NIM 12103005), Fitra Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/6123 ABSTRACT: <br /> <br /> <br /> <br /> <br /> Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an important concern to the mining activities. Mining operation applies cut and fill stoping method. The mineout spaces in the stope are back filled with slurry (60percent solid) from processing plants reject through piping system. Main access to reach mining area is using horizontal tunnel (adit) which called mine haulage level 500. The advance of mine operation applies the overhand method start from level 500, so that mine water and ground water will flow down and accumulated to MHL 500. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ABSTRACT: <br /> <br /> <br /> <br /> <br /> Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an important concern to the mining activities. Mining operation applies cut and fill stoping method. The mineout spaces in the stope are back filled with slurry (60percent solid) from processing plants reject through piping system. Main access to reach mining area is using horizontal tunnel (adit) which called mine haulage level 500. The advance of mine operation applies the overhand method start from level 500, so that mine water and ground water will flow down and accumulated to MHL 500.
format Final Project
author Ismaya (NIM 12103005), Fitra
spellingShingle Ismaya (NIM 12103005), Fitra
#TITLE_ALTERNATIVE#
author_facet Ismaya (NIM 12103005), Fitra
author_sort Ismaya (NIM 12103005), Fitra
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/6123
_version_ 1820663824417554432