#TITLE_ALTERNATIVE#
ABSTRACT: <br /> <br /> <br /> <br /> <br /> Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an importa...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/6123 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:6123 |
---|---|
spelling |
id-itb.:61232017-09-27T10:39:01Z#TITLE_ALTERNATIVE# Ismaya (NIM 12103005), Fitra Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/6123 ABSTRACT: <br /> <br /> <br /> <br /> <br /> Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an important concern to the mining activities. Mining operation applies cut and fill stoping method. The mineout spaces in the stope are back filled with slurry (60percent solid) from processing plants reject through piping system. Main access to reach mining area is using horizontal tunnel (adit) which called mine haulage level 500. The advance of mine operation applies the overhand method start from level 500, so that mine water and ground water will flow down and accumulated to MHL 500. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
ABSTRACT: <br />
<br />
<br />
<br />
<br />
Underground gold mine of PT. Aneka Tambang tbk. UBPE Pongkor is located in mountaineous area, the underground opening are relatively closed to the surface so the effect of ground water and surface water become an important concern to the mining activities. Mining operation applies cut and fill stoping method. The mineout spaces in the stope are back filled with slurry (60percent solid) from processing plants reject through piping system. Main access to reach mining area is using horizontal tunnel (adit) which called mine haulage level 500. The advance of mine operation applies the overhand method start from level 500, so that mine water and ground water will flow down and accumulated to MHL 500. |
format |
Final Project |
author |
Ismaya (NIM 12103005), Fitra |
spellingShingle |
Ismaya (NIM 12103005), Fitra #TITLE_ALTERNATIVE# |
author_facet |
Ismaya (NIM 12103005), Fitra |
author_sort |
Ismaya (NIM 12103005), Fitra |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/6123 |
_version_ |
1820663824417554432 |