DESIGN OF WASTE HEAT UTILIZATION SYSTEM IN BLOWDOWN PROCESS IN BOILER
Boiler blowdown is process water discharge from the boiler. The goal is to control the boiler water to the specified parameters, among others, to minimize the scale, corrosion, carryover, and other special problems. Blowdown is also used to remove sediment that is not required in the system as we...
Saved in:
Main Author: | Nanda Utama, Rizki |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61689 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BLOWDOWN HEAT ENERGY RECOVERY OF CIRCULATING FLUIDIZED BED BOILER IN PLTU 60 MW CAPACITY
by: Meidasari, Memey -
BLOWDOWN BOILER MASS FLOW SIMULATION IN MAINTAINING RELIABILITY AND EFFICIENCY OF COAL FIRED STEAM POWER PLANT (CASE STUDY IN PLTU OMBILIN 2 X 100 MW)
by: Sefriadi, Odi -
Study of Heating System Instrumentation of Boiler and Heat Exchanger Process in Mini Plant BDT921
by: Diah Wulandari Siantury, Tri -
Boiler heat losses and causes
by: Sandejas, Eliodoro R.
Published: (1954) -
PENERAPAN IDENTIFIKA SUBSPACE DAN PERANCANGAN KONTROL PREDIKTIF PADA WASTE HEAT BOILER (WHB)
by: Hamduria Faulin, Luke