DESIGN PLANNING OF MINIHYDRO POWER PLANT IN BONE BOLANGO REGENCY, GORONTALO PROVINCE, INDONESIA
The electricity crisis has occurred in Indonesia and coincided in the North Sulawesi region which is close to Gorontalo. This is a natural thing considering the large number of people in the area. To overcome this crisis problem, there is a plan to build an air power plant around the Gorontalo area...
Saved in:
Main Author: | Chandra, Steven |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/61750 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GEOTECHNICAL DESIGN PLANNING FOR MINIHYDRO POWER PLANT IN BONE BOLANGO
by: Bella Wibowo, Fabiola -
MANAGEMENT PLANNING ASPECT OF MINIHIDRO BONE BOLANGO POWER PLANT CONSTRUCTION
by: Yoshua Christianto, Vincentius -
TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
by: Boy Anggun Pribadi, Dhimas -
LEIHITU MINIHYDRO POWER PLANT DESIGN IN CENTRAL MALUKU REGENCY
by: CAHYA MAULANA (15813029), CACA -
STUDY OF BULANGO ULU DAM CONSTRUCTION ON FLOOD CONTROL AND MORPHOLOGY IN THE BOLANGO RIVER, GORONTALO PROVINCE.
by: Alamsyah M, Hendrianto