DESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA
The river flow conditions are very close to the mining area, at the upstream there is a road that cuts the flow of the river and at the downstream there is a pit. These conditions cause the need for a design so that the flow of the river can still be streamed and mining activities can still be do...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61805 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:61805 |
---|---|
spelling |
id-itb.:618052021-09-27T21:35:16ZDESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA Nur Awal, Mudzakkir Indonesia Final Project Flood discharge, Culvert, Embankment INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/61805 The river flow conditions are very close to the mining area, at the upstream there is a road that cuts the flow of the river and at the downstream there is a pit. These conditions cause the need for a design so that the flow of the river can still be streamed and mining activities can still be done optimally. The study used rainfall data with a time period from 2013-2019. Mononobe method is used in calculating the value of rainfall intensity and rational method to determining flood discharge. The design of the drainage was analyzed with Manning's equations. To facilitate research, two area reviews are used, namely Area 1, with the condition of the mine road that cuts the flow of the river and Area 2 with very close river flow conditions with pits. The results of the research obtained are by using a 10-year return period, obtained a flood discharge in Area 1 of 2.30 m3/ s, river control facilities in the form of a culvert with a diameter of 0.8 m. In Area 2 obtained a flood discharge of 1.40 m3/s, river control facilities in the form of a guard embankment with a height of 1.3 m. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The river flow conditions are very close to the mining area, at the upstream there is a road that
cuts the flow of the river and at the downstream there is a pit. These conditions cause the need
for a design so that the flow of the river can still be streamed and mining activities can still be
done optimally. The study used rainfall data with a time period from 2013-2019. Mononobe
method is used in calculating the value of rainfall intensity and rational method to determining
flood discharge. The design of the drainage was analyzed with Manning's equations. To
facilitate research, two area reviews are used, namely Area 1, with the condition of the mine
road that cuts the flow of the river and Area 2 with very close river flow conditions with pits.
The results of the research obtained are by using a 10-year return period, obtained a flood
discharge in Area 1 of 2.30 m3/ s, river control facilities in the form of a culvert with a diameter
of 0.8 m. In Area 2 obtained a flood discharge of 1.40 m3/s, river control facilities in the form
of a guard embankment with a height of 1.3 m. |
format |
Final Project |
author |
Nur Awal, Mudzakkir |
spellingShingle |
Nur Awal, Mudzakkir DESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA |
author_facet |
Nur Awal, Mudzakkir |
author_sort |
Nur Awal, Mudzakkir |
title |
DESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA |
title_short |
DESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA |
title_full |
DESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA |
title_fullStr |
DESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA |
title_full_unstemmed |
DESIGN OF RIVER CONTROL FACILITIES IN THE MINING AREA |
title_sort |
design of river control facilities in the mining area |
url |
https://digilib.itb.ac.id/gdl/view/61805 |
_version_ |
1822003934920704000 |