PROPOSED SOLUTION TO ENHANCE PROJECT COMPLETION TIMELINESS IN ELECTRICAL & CONTROL PROJECT SECTION, PEPS DEPARTMENT, PT. KALTIM PRIMA COAL (KPC)
The Electrical and Control Project (E&C) section is an unit of the Plant Engineering and Project Services (PEPS) department which is responsible for managing electrical and instrument projects within the Coal Processing and Handling Division (CPHD). The PEPS department itself acts as the Proje...
Saved in:
Main Author: | Adi Ramadhani, Nugroho |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62462 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPERATIONAL IMPROVEMENT IN INFRASTRUCTURE DEPARTMENT CONTRACT SERVICE PERFORMANCE AT PT. KALTIM PRIMA COAL
by: Sagala, Ruth -
DESIGN OF HUMAN SCORECARD USING THE BALANCED SCORECARD FRAMEWORK FOR HAUL TRUCK MAINTENANCE DEPARTMENT PT. KALTIM PRIMA COAL
by: Yogastama, Agisatyo -
INCREASING THE ADOPTION OF PERFORMANCE MANAGEMENT APPLICATION AT PT. KALTIM PRIMA COAL
by: Freddy Manurung, Ronald -
OUTSOURCING IN OPERATION AND MAINTENANCE SERVICES FOR LUBUK TUTUNG COAL TERMINAL OF PT KALTIM PRIMA COAL
by: Laily, Alfan -
MEASURE THE EFFECTIVENESS OF CSR PROGRAM GERAK BERSEMI AT PT KALTIM PRIMA COAL
by: Ramadhan, Mohamad