CENTRALIZED MODâS COAL ROM PIT STOCKPILEMODELING USING ACTIVITY BASED COSTING ANALYSIS IN INITIATIVE TO REDUCE UNIT COST AT COAL MINING DEPARTMENT PT. KALTIM PRIMA COAL
PT. Kaltim Prima Coal (PT KPC) is a coal mining company that is placed in Sangatta project which is currently being faced is a decrease in profit for each tonnage of coal unit. In 2020, changes in coal prices on the world market are largely the result of a pandemic situation in all parts of the...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62631 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | PT. Kaltim Prima Coal (PT KPC) is a coal mining company that is placed in
Sangatta project which is currently being faced is a decrease in profit for each tonnage
of coal unit. In 2020, changes in coal prices on the world market are largely the result of
a pandemic situation in all parts of the world. This price change has urged PT Kaltim
Prima Coal to take various initiatives to maintain its margin so that it remains positive
so that it can survive amid the conditions of falling prices.
Coal Mining Department under Mining Operation Division that has responsibility
for MOD Coal movement, already identified some of part that potentially could be
improve related their operational activity. Compared to the competitors PT. Thiess
Contractor Indonesia and PT PAMA, Coal Mining Department has some unique
parameter that it make the unit cost much higher than the competitors.
Currently ytd 2020 actual unit cost for whole Coal Mining Department is 2.17
($/ton). The 3 biggest contributor is come from Coal Mined, Coal reclaim and also Coal
Hauling activity. For coal support and coal road maintenance overall was the same as
contractor’s rate. Actual there are 3 coal flow activity for the current practice, coal
mined, coal reclaimed and also coal re-handle. Including on that is coal crushed that
coal flow practically flow coal material from stockpile (ROM Pit & ROM) and also from
Pit to crusher.
These final project will looking for the root cause of the higher rate of Coal Mining
Department by using ABC (activity Based Costing) modeling and using issue tree
analysis. The project methodology is by do some literature study and analysis at actual
vs budget report Coal Mining 2020, and also make some modification at the main activity
loading , hauling and also reclaim for proposed the solution to decrease the overall unit
cost of the main activity. |
---|