STUDY OF THE EFFECTIVENESS OF UPGRADING AND OPERATIONS & MAINTENANCE (O & M) RINJANI CHECK DAM ON FLOOD EARLY WARNING SYSTEM AND LEAD TIME ON THE BATU MERAH RIVER IN AMBON CITY
The history of the flood disaster that occurred in Ambon City in 2012 and 2013 caused the highest loss of life and material loss to the community. The natural condition of Ambon City which is an archipelago with steep areas is one of the physical factors that causes many landslides to occur. This av...
Saved in:
Main Author: | Tri Bunai, Putit |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62721 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
KAJIAN SEDIMENTASI SUNGAI BATU MERAH (CHECK DAM RINJANI) KOTA AMBON
by: Setiawan, Bayu -
RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
by: Magdalena Simangunsong, Diana -
FLOOD CONTROL PLANNING OF THE WAI BATU MERAH WATERSHED, AMBON CITY, MALUKU PROVINCE
by: Fitriani, Djelia -
EFFECTIVENESS OF SABO DAM IN INTEGRATED FLOOD CONTROL IN THE MILANGODAA RIVER.
by: Irmanto -
RAINFALL THRESHOLDS FOR FLOOD EARLY WARNING SYSTEM (CASE STUDY: BENGAWAN SOLO RIVER BASIN)
by: HADIANI, REVANA