DEVELOPMENT OF FLOOD MITIGATION SYSTEM AT BINUNGAN MINE OPERATION BY UTILIZING KELAY RIVER EARLY WARNING SYSTEM, BERAU DISTRICT, EAST KALIMANTAN

<p align="justify"> The development of a flood mitigation system at the Binungan mine site is necessary to minimize the risk of flooding, as river water overflow can enter the active open-pit mine, resulting in casualties and loss of mine operating units due to drowning. In the last...

Full description

Saved in:
Bibliographic Details
Main Author: Baiquni, Ahmad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75699
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia