DEVELOPMENT OF FLOOD MITIGATION SYSTEM AT BINUNGAN MINE OPERATION BY UTILIZING KELAY RIVER EARLY WARNING SYSTEM, BERAU DISTRICT, EAST KALIMANTAN
<p align="justify"> The development of a flood mitigation system at the Binungan mine site is necessary to minimize the risk of flooding, as river water overflow can enter the active open-pit mine, resulting in casualties and loss of mine operating units due to drowning. In the last...
Saved in:
Main Author: | Baiquni, Ahmad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75699 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CHARACTERISTICS OF BONE COAL IN MINING AREA OF PT. BERAU COAL BINUNGAN AND SAMBARATA MINING SITE BERAU SUB-BASIN, TARAKAN BASIN, EAST KALIMANTAN
by: DIAN RIFALDI (NIM : 12113074), MIRZA -
IMPLEMENTATION MINING EYES TECHNOLOGY FOR OPERATIONAL EFECTIVENESS BINUNGAN MINE OPERATION TWO PT BERAU COAL, EAST KALIMANTAN
by: Idris, Jimmi -
STUDY OF KELAY RIVERâS INFLUENT SCENARIO WHICH AFFECTED BY COAL MINING ACTIVITIES USING THE STREAM MODEL APPROACH IN BERAU, EAST KALIMANTAN.
by: Salsadila, Alifya -
SLOPE STABILITY ANALYSIS IN COAL MINE USING LIMIT EQUILIBRIUM METHOD AND FINITE ELEMENT METHOD IN BLOCK 8 BINUNGAN MINE OPERATION 2 PT BERAU COAL, BERAU DISTRICT, EAST KALIMANTAN
by: Farel Putrafidi, Muhamad -
DESIGN ANALYSIS OF FILLING VOID D2 WITH BINUNGAN RIVER WATER AT PT BERAU COAL KALIMANTAN TIMUR
by: Hasanah, Sarah