MINE DRAINAGE FACILITY PLANNING AT OUT-PIT DUMP C1 SITE BINUNGAN MINE OPERATION 2 BLOK 8 PT BERAU COAL, EAST KALIMANTAN

In open-pit mining, the overburden material needs to be excavated or blasted to a certain depth. The material will be transported to the disposal area according to the planned progress plan. When there is heavy rain, the disposal material will be eroded due to its characteristic as a loose material....

Full description

Saved in:
Bibliographic Details
Main Author: Clara Chika Giri Asta P, Putu
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69380
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia