MINE DRAINAGE FACILITY PLANNING AT OUT-PIT DUMP C1 SITE BINUNGAN MINE OPERATION 2 BLOK 8 PT BERAU COAL, EAST KALIMANTAN
In open-pit mining, the overburden material needs to be excavated or blasted to a certain depth. The material will be transported to the disposal area according to the planned progress plan. When there is heavy rain, the disposal material will be eroded due to its characteristic as a loose material....
Saved in:
Main Author: | Clara Chika Giri Asta P, Putu |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69380 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF OUT PIT DUMP MINE DRAINAGE IN POST-MININNG SYSTEM (CASE STUDY OF OPD WEST PIT ON 2 SITE LATI MINE OPERATION PT BERAU COAL, BERAU REGENCY, EAST KALIMANTAN)
by: Fikri Lazuardi, Muhammad -
MINE DRAINAGE FACILITY PLANNING AT WASTE DUMP COAL MINE OF PT XYZ
by: Ernasari, Meilia -
MINE DRAINAGE FACILITIES PLANNING IN PIT OF COAL MINING PT XYZ
by: Indriani Amir, Lili -
MINE DRAINAGE FACILITY PLANNING OF SEMERU WASTE DUMP AT PT XYZ COAL MINE
by: Muhammad, Zaki -
INVESTMENT ANALYSIS OF CRUSHING STATION 11 UPGRADE TO SUPPORT COAL PRODUCTION IN PIT Z, BINUNGAN MINE OPERATIONS, PT. BERAU COAL
by: Fadhlullah Muharam, Adnan