CISUMDAWU HIGHWAY SECTION 4 OPEN CUT SLOPE STABILITY ANALYSIS DUE TO BLASTING VIBRATION WITH NEWMARK DISPLACEMENT ANALYSIS

Section 4 Cisumdawu Toll Road was built by carrying out blasting activities. Blasting could affect slope stability, so it is necessary to find the value of the Factor of Safety (FoS) dynamically. The analysis was conducted using 2D numerical modeling with Slide2 software for Limit Equilibrium Method...

Full description

Saved in:
Bibliographic Details
Main Author: Adib Ardhana, Zharfan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/63061
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items