PEMILIHAN ALTERNATIF KOMBINASI ALAT GALI-MUAT DAN ALAT ANGKUT UNTUK MENGURANGI BIAYA BAHAN BAKAR PADA AKTIVITAS PENGGALIAN BATUBARA DI PT XYZ
PT. XYZ is one of the mining companies in Indonesia located in South Kalimantan Province with coal as its main mining commodity. PT. XYZ uses a digging tool in the form of a backhoe and a transportation tool in the form of a dump truck. For the B85-B105 front, the tools used are Komatsu PC2000 and P...
Saved in:
Main Author: | Sendika Pahala Praja M., Gusma |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/63068 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMASI KEBUTUHAN ALAT GALI-MUAT DAN ALAT ANGKUT PADA PENAMBANGAN BATUBARA DENGAN METODE PROGRAM LINEAR MENGGUNAKAN PROGRAM SOLVER DI PT ABC
by: Rizky Mitcheliana, Sasha -
ANALISIS PRODUKTIVITAS ALAT GALI-MUAT LIEBHERR R9350 PT THIESS CONTRACTORS INDONESIA JOBSITE WAHANA HANOMAN KALIMANTAN SELATAN
by: Fani, Niko -
ANALISIS FLYROCK UNTUK MENGURANGI RADIUS AMAN ALAT PADA
PELEDAKAN OVERBURDEN PENAMBANGAN BATUBARA
by: Havis, Abdurrachman, et al.
Published: (2015) -
PENGARUH PERDAGANGAN VERTIKAL TERHADAP KINERJA INDUSTRI ALAT ANGKUT DI INDONESIA
by: RIZAL RAHMAT DARMAWAN, 041211132088
Published: (2016) -
Simulasi sistem pengontrol lengan angkat (Holder) pada alat angkut ban berjalan (Conveyor Belt)
by: , DJUMHADI, et al.
Published: (2004)