PROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY

PT. Maintenance Indonesia (PT. MI) is one of Indonesia’s MRO companies that focuses on repairing and supplying commercial aircraft operators, military, police, and governments’ aircrafts. The services that the company offers include inspection, repair, and overhaul of propeller, cylinder equipment,...

Full description

Saved in:
Bibliographic Details
Main Author: Ayuning Putri, Nadia
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/63546
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:63546
spelling id-itb.:635462022-02-17T12:57:21ZPROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY Ayuning Putri, Nadia Indonesia Theses MRO Industry, Project Delay, Inventory Management, Project Monitoring, Project Communication. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/63546 PT. Maintenance Indonesia (PT. MI) is one of Indonesia’s MRO companies that focuses on repairing and supplying commercial aircraft operators, military, police, and governments’ aircrafts. The services that the company offers include inspection, repair, and overhaul of propeller, cylinder equipment, radio, instrument, battery, and accessories. The company is committed to be able to minimize the time of the aircraft on ground (AOG) and make sure that the promised turnaround time (TAT) with customer can be achieved in order to guarantee highest level of customer satisfaction at the best costs. Currently, the company often times faced delay in the propeller maintenance project and cannot be able to meet the promised TAT with the customer. The focus of this research is to analyze the root cause of the project delay and provide recommended solution to solve the problem and improve the situation. The research employs qualitative research to gather information and opinion from the perspective of various company stakeholders through interview. Root cause analysis is defined by mapping the information obtained from the interview that is extracted into several keyword. Besides the interview result, literature review from various resources such as books and journals is used to support the author on finding the conclusion of the issue and recommendation. Based on the analysis, there are four major challenges that cause the project delay, which are lack of coordination, spare part not ready stock, long shipment process, and lack of monitoring. The proposed solutions to solve the issue are setting frequent meeting program with related stakeholders, developing monitoring system, and implementing exchange program. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT. Maintenance Indonesia (PT. MI) is one of Indonesia’s MRO companies that focuses on repairing and supplying commercial aircraft operators, military, police, and governments’ aircrafts. The services that the company offers include inspection, repair, and overhaul of propeller, cylinder equipment, radio, instrument, battery, and accessories. The company is committed to be able to minimize the time of the aircraft on ground (AOG) and make sure that the promised turnaround time (TAT) with customer can be achieved in order to guarantee highest level of customer satisfaction at the best costs. Currently, the company often times faced delay in the propeller maintenance project and cannot be able to meet the promised TAT with the customer. The focus of this research is to analyze the root cause of the project delay and provide recommended solution to solve the problem and improve the situation. The research employs qualitative research to gather information and opinion from the perspective of various company stakeholders through interview. Root cause analysis is defined by mapping the information obtained from the interview that is extracted into several keyword. Besides the interview result, literature review from various resources such as books and journals is used to support the author on finding the conclusion of the issue and recommendation. Based on the analysis, there are four major challenges that cause the project delay, which are lack of coordination, spare part not ready stock, long shipment process, and lack of monitoring. The proposed solutions to solve the issue are setting frequent meeting program with related stakeholders, developing monitoring system, and implementing exchange program.
format Theses
author Ayuning Putri, Nadia
spellingShingle Ayuning Putri, Nadia
PROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY
author_facet Ayuning Putri, Nadia
author_sort Ayuning Putri, Nadia
title PROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY
title_short PROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY
title_full PROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY
title_fullStr PROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY
title_full_unstemmed PROPOSED IMPROVEMENT TO PREVENT PROPELLER MAINTENANCE DELAY AT AN MRO COMPANY
title_sort proposed improvement to prevent propeller maintenance delay at an mro company
url https://digilib.itb.ac.id/gdl/view/63546
_version_ 1822932184736989184