INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X

Increasing population growth and technology require adequate electricity infrastructure support. PT PLN (Persero) as a State-Owned Enterprise (BUMN) entrusted by the government to manage electricity by Law No. 30 of 2009. Through the ten-year work program as outlined in the RUPTL, PT PLN (Persero) c...

Full description

Saved in:
Bibliographic Details
Main Author: Tria Pratiwi, Novriani
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/63763
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:63763
spelling id-itb.:637632022-03-02T14:57:43ZINVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X Tria Pratiwi, Novriani Manajemen umum Indonesia Theses Underground High Voltage Cable, Electrical Reliability, Investment project analysis, Sensitivity Analysis, Monte Carlo Simulation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/63763 Increasing population growth and technology require adequate electricity infrastructure support. PT PLN (Persero) as a State-Owned Enterprise (BUMN) entrusted by the government to manage electricity by Law No. 30 of 2009. Through the ten-year work program as outlined in the RUPTL, PT PLN (Persero) carried out various additions to electricity infrastructure and strived to maintain the reliability of the electrical system so that it can be in line with the vision of PT PLN (Persero), which is to become the customer's first choice for energy solutions. Java Island has the highest electrical energy consumption in Indonesia, especially for DKI Jakarta, the capital city of Indonesia. However, the reserve margin has reached a safe limit, above 30%. PT PLN (Persero) is faced with the challenge of the electrical system’s reliability due to disturbances in the Underground High Voltage (UHV) Cable in area X. Of the two operating circuits. Currently, only one circuit can be utilized due to oil leakage in the cables. The operating life and economy of the cable are nearing the end is one of the causes of the decline in cable performance. To maintain this reliability stability, it is necessary to replace UHV Cable in area X. Amid the Covid-19 pandemic, PT PLN (Persero) is more selective in providing investment budget allocations. A ceiling budget has been set for UHV Cable in area X. This research is conducted to analyze two alternative investment scenarios to be considered by PT PLN (Persero). The first scenario is to replace parts of the UHV Cable and the second scenario is to replace the entire UHV Cable in area X. The method used in this research is capital budgeting analysis to determine the best investment alternative for PT PLN (Persero). This research also conducts a risk analysis to determine the very sensitive parameters influencing the project’s feasibility. Of the two alternatives that have been considered by PT PLN (Persero), scenario 1 is the best investment that has met the investment criteria and the ceiling budget of PT PLN (Persero). Based on the investment project analysis, the NPV value is IDR 237.489.737,00 (in thousand), IRR 13,13%, Profitability Index 1,47, payback period 8,96 years, and discounted payback period 8,96 years. From the sensitivity analysis, the four most sensitive parameters were obtained, namely electricity rates, Capacity Factor (CF), EPC costs, and Income Tax. In the monte Carlo Simulation analysis, it is found that the probability of a negative NPV or a value of 0 is 0%, the probability of a NPV greater than IDR 237.489.737,00 (In a Thousand) is 33,69%, the probability of a NPV being lower than IDR 237.489.737,00 (In a Thousand) is 66,31%. This shows that replacing parts of the UHV Cable in area X has met all the PT PLN (Persero) criteria and is eligible for investment. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Tria Pratiwi, Novriani
INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X
description Increasing population growth and technology require adequate electricity infrastructure support. PT PLN (Persero) as a State-Owned Enterprise (BUMN) entrusted by the government to manage electricity by Law No. 30 of 2009. Through the ten-year work program as outlined in the RUPTL, PT PLN (Persero) carried out various additions to electricity infrastructure and strived to maintain the reliability of the electrical system so that it can be in line with the vision of PT PLN (Persero), which is to become the customer's first choice for energy solutions. Java Island has the highest electrical energy consumption in Indonesia, especially for DKI Jakarta, the capital city of Indonesia. However, the reserve margin has reached a safe limit, above 30%. PT PLN (Persero) is faced with the challenge of the electrical system’s reliability due to disturbances in the Underground High Voltage (UHV) Cable in area X. Of the two operating circuits. Currently, only one circuit can be utilized due to oil leakage in the cables. The operating life and economy of the cable are nearing the end is one of the causes of the decline in cable performance. To maintain this reliability stability, it is necessary to replace UHV Cable in area X. Amid the Covid-19 pandemic, PT PLN (Persero) is more selective in providing investment budget allocations. A ceiling budget has been set for UHV Cable in area X. This research is conducted to analyze two alternative investment scenarios to be considered by PT PLN (Persero). The first scenario is to replace parts of the UHV Cable and the second scenario is to replace the entire UHV Cable in area X. The method used in this research is capital budgeting analysis to determine the best investment alternative for PT PLN (Persero). This research also conducts a risk analysis to determine the very sensitive parameters influencing the project’s feasibility. Of the two alternatives that have been considered by PT PLN (Persero), scenario 1 is the best investment that has met the investment criteria and the ceiling budget of PT PLN (Persero). Based on the investment project analysis, the NPV value is IDR 237.489.737,00 (in thousand), IRR 13,13%, Profitability Index 1,47, payback period 8,96 years, and discounted payback period 8,96 years. From the sensitivity analysis, the four most sensitive parameters were obtained, namely electricity rates, Capacity Factor (CF), EPC costs, and Income Tax. In the monte Carlo Simulation analysis, it is found that the probability of a negative NPV or a value of 0 is 0%, the probability of a NPV greater than IDR 237.489.737,00 (In a Thousand) is 33,69%, the probability of a NPV being lower than IDR 237.489.737,00 (In a Thousand) is 66,31%. This shows that replacing parts of the UHV Cable in area X has met all the PT PLN (Persero) criteria and is eligible for investment.
format Theses
author Tria Pratiwi, Novriani
author_facet Tria Pratiwi, Novriani
author_sort Tria Pratiwi, Novriani
title INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X
title_short INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X
title_full INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X
title_fullStr INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X
title_full_unstemmed INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X
title_sort investment project analysis of underground high voltage cable replacement : case study of pt pln (persero) in area x
url https://digilib.itb.ac.id/gdl/view/63763
_version_ 1822932242146525184